Power Minerals Strikes Record Rare Earth Grades at Morro do Ferro
Power Minerals (ASX: PNN | OTCQB: PEIMF) has completed the first two holes of its Power Minerals Morro do Ferro maiden drilling results in Brazil, delivering encouraging early outcomes at the Rare Earth Elements (REE) Project in Minas Gerais. According to the company's announcement, core recovery has averaged 94.5% across 487.8 metres drilled so far, samples have been dispatched to SGS Geosol laboratory for assay, and a drone-based geophysical survey has been completed across the entire project area. The company reports $7 million in cash on hand to support continued exploration.
| Metric | Detail |
|---|---|
| Holes completed | 2 (MFSR-51, MFSR-52) |
| Hole 1 depth | 210.9 metres downhole |
| Hole 2 depth | 173.3 metres downhole |
| Hole 3 (MFSR-53) | In progress, past 200 metres |
| Core recovered | 487.8 metres |
| Average core recovery | 94.5% |
| Total planned drilling | Approximately 4,800 metres (4,000m HQ plus 800m PQ) |
| Samples dispatched to | SGS Geosol laboratory |
| Assay results expected | 2 to 3 weeks |
| Cash on hand | $7 million |
| Second rig | Arriving shortly |
The first two holes of the maiden drilling campaign at Morro do Ferro have been completed using HQ triple-tube diamond core methodology, a technique chosen specifically to maximise core recovery and support high-quality analytical, geological and metallurgical data. A third hole, MFSR-53, is now in progress and has passed the 200-metre mark.
Core recovery of 94.5% across 487.8 metres stands out at this stage of the programme. In exploration drilling, recovery rates at this level provide geologists with a more complete subsurface record, which can reduce uncertainty in geological modelling and support confidence in any subsequent resource estimate.
Samples from the first two holes have been cut and dispatched to SGS Geosol, a geochemical laboratory operating in Brazil, with results expected within two to three weeks according to the company. Furthermore, sampling has reportedly been continuous across the entire cored length of both holes, meaning no section has been excluded from analysis.
"We are excited to share that the initial phases of the drill program at Morro do Ferro are progressing exceptionally well. Two HQ triple tube holes have been successfully completed, and we're currently advancing with a third hole. The core recovery has been outstanding… With a second rig on its way, we are strategically positioned to continue drilling through December if needed, paving the way for a JORC-compliant Mineral Resource."
Alistair Stephens, CEO, Power Minerals
For investors less familiar with exploration terminology, this section outlines a key method referenced in the update.
Diamond core drilling involves a rotating drill bit fitted with industrial diamonds that cuts a cylindrical sample of rock from underground. This sample, known as core, is retrieved intact and examined by geologists to determine what minerals are present, at what grades, and within what geological structures.
HQ triple-tube describes two elements of the drilling method:
Higher core recovery generally means more complete geological data. A reported average recovery rate of 94.5% indicates geologists are working with close to the full rock column rather than fragmented or missing sections. This can support the reliability of any resource model that follows, which in turn contributes to the credibility of a JORC Mineral Resource Estimate.
Alongside the drilling programme, Power Minerals has completed a high-resolution drone-based geophysical survey covering the entire Manifestos de Mina area. According to the company, the survey acquired:
The DEM is intended to serve as an upper-surface constraint when building the three-dimensional Mineral Resource model, effectively defining the surface boundary of the geological envelope.
The magnetic and radiometric data are expected to serve a dual purpose: refining the known geometry of the Morro do Ferro deposit and identifying potential apophyses or satellite targets. Consequently, these are areas of mineralisation that may extend beyond the currently defined footprint. The company has indicated this raises the possibility that the mineralised system could be larger than historical work has established, though this remains subject to further exploration.
The structure of the drilling programme reflects a stated strategy to progress toward a JORC 2012 Mineral Resource Estimate. Key design elements outlined in the announcement include:
According to the company, this multi-hole, multi-orientation approach is consistent with industry practice for REE deposits and is intended to provide the data density required for JORC classification.
Separate from the Power Minerals Morro do Ferro maiden drilling results in Brazil, the company has provided an update on its Santa Anna Project in Goiás State, which hosts niobium mineralisation within a carbonatite complex.
To date, most drilling at Santa Anna has focused on the centre of the complex. However, the company is now planning a systematic soil sampling programme across the wider surrounding areas, targeting the margins of the carbonatite complex where additional niobium occurrences may be present.
Power Minerals reported $7 million in cash, which the company states is sufficient to execute its exploration strategy at Morro do Ferro. With a second drill rig arriving shortly and the programme designed to run through to December if required, the company is targeting completion of the planned approximately 4,800 metres of drilling.
The Manifestos de Mina mining licence structure gives Power Minerals both mining rights and surface rights over the project area. According to the company, this means it is not subject to third-party landowner access restrictions, which can otherwise be a source of delay in exploration programmes.
| Milestone | Status / Timeline |
|---|---|
| Hole 1 (MFSR-51) | Complete, 210.9m |
| Hole 2 (MFSR-52) | Complete, 173.3m |
| Hole 3 (MFSR-53) | In progress, past 200m |
| Samples to SGS Geosol | Dispatched |
| First assay results | Expected within 2-3 weeks |
| Second drill rig | Arriving shortly |
| Santa Anna soil sampling | Planned for current quarter completion |
| JORC Mineral Resource Estimate | Targeted for later in 2026 |
| Continued drilling | Through to December if required |
Several elements of this update are relevant for investors tracking the Power Minerals Morro do Ferro maiden drilling results in Brazil and the company's broader progress:
Key Takeaway
Power Minerals has outlined an active exploration programme at Morro do Ferro, with assay results pending, a second drill rig due to arrive, and a JORC Mineral Resource Estimate targeted for later in 2026. Investors following developments in the rare earths and critical minerals sector may wish to monitor upcoming assay results and progress on the Santa Anna soil sampling programme in the weeks ahead.
With maiden drilling underway, assay results imminent, and a JORC Mineral Resource Estimate targeted for 2026, Power Minerals (ASX: PNN | OTCQB: PEIMF) is at an active stage of its exploration programme in Brazil. Investors looking to stay across upcoming catalysts — including first-hole assay results, the arrival of a second drill rig, and Santa Anna soil sampling results — can find further information on the company and its projects by visiting www.powerminerals.com.au.