MetalsGrove Mining Launches 10,000m Auger Programme at Zuénoula Gold Project
MetalsGrove Mining Vavoua gold targets in Côte d'Ivoire have emerged as a key focus for Metalsgrove Mining Ltd (ASX: MGA), following early-stage exploration results from the Vavoua Permit. Several gold-anomalous areas have been generated from initial soil and termite mound sampling programs, marking a significant step forward for the company's West African operations.
Work to date has defined the 35 km² Dubaso Prospect in the north of the permit, along with two additional gold-anomalous areas in the southwest associated with a regional shear zone. According to the 23 June 2026 ASX announcement, these outcomes are part of a systematic programme across the broader Central West Gold Project, which covers 1,315.84 km² along the Abujar–Napié gold trend in the Oumé–Fetekro Birimian greenstone belt.
Managing Director and CEO Lijun Yang commented on the results:
"The results from our initial exploration programs at the Vavoua Permit are highly encouraging and continue to demonstrate the effectiveness of our systematic exploration approach. The definition of the 35km² Dubaso Prospect from initial soil sampling, combined with favourable geology including sheared intermediate volcanics and quartz veining, highlights the potential for the discovery of gold mineralisation."
The Dubaso Prospect has been identified in the northern portion of the Vavoua Permit through broad-spaced soil sampling. According to Metalsgrove Mining Ltd, soil sampling on an 800 m by 800 m grid has highlighted a coherent cluster of low-order gold anomalies.
Key technical outcomes at Dubaso include:
The combination of a coherent geochemical footprint and a structurally favourable host environment is consistent with the style of orogenic gold systems typical of the West African Birimian greenstone terranes.
For investors, the current stage at Dubaso indicates several important points:
In the southwest of the Vavoua Permit, Metalsgrove Mining Ltd has adjusted its exploration technique due to complex near-surface conditions. The regolith in this area is highly leached and surface soils are largely devoid of gold, which reduces the effectiveness of conventional soil sampling.
An orientation study concluded that termite mound sampling is the most appropriate first-pass tool in this setting.
Results from the termite mound programme include:
This approach reflects a methodical response to local geological conditions. Termites transport material from depths of up to around 15 m to build mounds, and sampling this material allows geochemists to test below the strongly leached near-surface horizon — which can be critical in tropical terrains.
From an investor perspective, the termite mound anomalies offer further promise:
Early-stage gold exploration is often misunderstood as a single event driven by drilling. In reality, companies such as Metalsgrove Mining Ltd apply a staged exploration framework that progressively reduces geological uncertainty and focuses expenditure on the most promising targets.
In unexplored or "greenfields" regions, drilling without prior geochemical and geological work can be highly inefficient. Furthermore, a stepwise approach allows:
According to the Vavoua announcement, Metalsgrove Mining Ltd uses a six-stage sampling framework:
| Stage | Activity | Typical Grid Spacing |
|---|---|---|
| 1 | Initial, permit-wide reconnaissance soil sampling | 800 m × 800 m |
| 2 | Infill sampling of clusters and trends with multiple anomalies (>10 ppb Au) | 800 m × 100 m |
| 3 | Infill of coherent soil anomalies | 400 m × 100 m |
| 4 | High-density sampling to sharpen anomalies | 200 m × 50 m |
| 5 | Auger drilling and trenching of coherent anomalies | Target-specific |
| 6 | Drill testing of soil and auger anomalies | Target-specific |
The Dubaso Prospect is currently in Stage 3, with 400 m × 100 m infill underway. The southwest termite mound targets are, however, advancing towards Stage 5, where auger drilling will be used.
To support interpretation of Metalsgrove Mining Ltd's results, several technical concepts are worth clarifying:
By understanding these concepts, investors can better interpret what early-stage anomalies might represent and why multiple techniques are applied across different parts of a project.
The Vavoua Permit forms part of the MetalsGrove Mining Vavoua gold targets programme within the broader Central West Gold Project, which includes four permits under joint venture and application arrangements.
The permits are located within the Oumé–Fetekro Birimian greenstone belt along the Abujar–Napié gold trend — a structural corridor that hosts several multi-million-ounce gold deposits. Key contextual points include:
The permit details are summarised below:
| Permit | Permit ID | Type | Status | MGA Ownership | Area (km²) |
|---|---|---|---|---|---|
| Zuénoula | PR-750 | Exploration | Granted | Earning up to 80% | 395.78 |
| Vavoua | PR-454 | Exploration | Granted | Earning up to 80% | 378.25 |
| Kounahiri West | PR-1063 | Exploration | Application | 90% on granting | 338.48 |
| Vavoua West | PR-1102 | Exploration | Application | 90% on granting | 203.33 |
| Total | 1,315.84 |
Vavoua PR-454, where the Dubaso and termite mound anomalies have been identified, was granted on 3 December 2025 for an initial four-year period and is renewable for two further three-year periods. Metalsgrove Mining Ltd is not aware of any previous systematic gold exploration across its four permits.
For investors, this positioning implies:
Metalsgrove Mining Ltd has outlined the next phases of work designed to refine current anomalies and assess their potential as future drill targets.
Planned activities at the Dubaso Prospect include:
For the southwest termite mound targets, the company has scheduled:
These steps align with the staged framework described by Metalsgrove Mining Ltd and illustrate a clear progression from geochemical screening to more detailed subsurface assessment.
From an investment perspective, the MetalsGrove Mining Vavoua gold targets announcement provides several points of interest:
As with any early-stage gold exploration, results at this point are geochemical and geological rather than resource-based. However, Metalsgrove Mining Ltd has stated that these programmes are expanding its pipeline of exploration targets and providing guidance on which techniques are most effective across the Central West Gold Project.
Key takeaway: Metalsgrove Mining Ltd's initial sampling at the Vavoua Permit has outlined the 35 km² Dubaso Prospect and two termite mound anomalies aligned with a regional shear zone. With ongoing infill soil sampling, mapping, termite mound programmes and auger drilling planned, the company is advancing a series of early-stage targets within a large, undrilled landholding situated between known multi-million-ounce gold deposits in Côte d'Ivoire.
MetalsGrove Mining Ltd (ASX: MGA) is advancing a large-scale, early-stage exploration programme across its 1,315.84 km² Central West Gold Project in Côte d'Ivoire, with multiple emerging targets now defined at the Vavoua Permit. For investors seeking exposure to greenfields gold exploration along a proven West African gold trend, find out more about the company and its projects by visiting metalsgrove.com.au.