Neometals Logs No Significant Copper at Rinaldi as Water Halts Hole 50m Early

Neometals Rinaldi Copper drilling results return no significant intersection in the 78–124m interval of RC hole 26RCRC006, but the untested T2 DDIP target and a diamond drill tail scheduled for September 2026 keep the Barrambie copper thesis alive.
By William Hadrian -
This is a special feature article produced for our partner.
Summarise with Ai:

Opening summary

Neometals has reported no significant intersection from a 45-metre interval tested at its historic Rinaldi Copper prospect, marking a setback in the company’s exploration campaign at the 100%-owned Barrambie Gold Project in Western Australia’s Murchison Goldfield. Assays from 78m to 124m in RC drillhole 26RCRC006 returned no significant copper, gold or silver values, despite visual indicators that prompted accelerated testing. The hole was discontinued approximately 50 metres short of target depth due to water ingress, abandoned at 124 metres. Assays for the remaining 0m–78m interval are still pending, and management has scheduled a diamond drill tail for September 2026 to test the T2 dipole-dipole induced polarisation target that the RC hole failed to reach.

What the drilling returned — and what’s still pending

The 45 samples selected for expedited analysis were chosen based on visual indicators — a broad quartz-pyrite zone and one individual metre showing weak 1% chalcopyrite. This subset represents approximately 12% of all drill samples collected from the July 2026 RC drilling program at the Rinaldi copper prospect. The source announcement makes clear this is not exhaustive and not necessarily representative of the hole or broader prospect. The hole was discontinued due to water ingress before reaching its planned depth.

Drillhole 26RCRC006 Depth & Assay Status

Interval (m) Status Copper Gold/Silver Note
0–78m Assays Pending Pending Pending Ongoing analysis
78–124m NSI No significant intersection NSI Selected on visual indicators

Drillhole details from the programme:

  • Hole ID: 26RCRC006
  • Type: RC
  • Dip: -55°
  • Azimuth: 070°
  • Final depth: 124m
  • Location: E57/1041, 100%-owned granted Exploration Licence

Understanding the T2 DDIP target and IP geophysics

Dipole-dipole induced polarisation is a geophysical method that detects buried sulphide minerals by measuring chargeability in the ground. Sulphides like chalcopyrite and pyrite — the minerals associated with copper deposits — hold an electrical charge differently than barren rock, creating anomalies that can be modelled and targeted.

The T2 DDIP target is a modelled chargeability anomaly Neometals still wants to test at depth. The RC hole didn’t reach it. That is why the diamond tail matters. Geophysical targets guide drilling toward potential mineralisation. The T2 target remains untested, which gives the September drill tail material significance despite the NSI result from the RC hole.

Next steps: assays, diamond tail and surface programmes

Management has outlined a forward roadmap focused on completing the assay programme and testing the T2 target:

  1. Routine copper, gold and silver analysis of remaining 0m–78m samples from 26RCRC006 to be reported once received, compiled and validated.
  2. Gold analysis of 662 metres across five RC drill holes drilled at Ironclad — pending.
  3. A diamond drill tail planned for September 2026 to test the T2 DDIP target, subject to operational conditions and approvals.
  4. A detailed magnetic survey commencing this week.
  5. A soil geochemistry programme being designed to verify historic anomalous soils over and adjacent to the T2 target.

The broader Barrambie Gold context adds weight to the forward programme. The Ironclad deposit has an updated Mineral Resource Estimate, Scoping Study and a mining-contractor joint venture with 50:50 profit sharing — a potentially funded pathway to near-term development that keeps the gold project advancing while Rinaldi copper exploration continues.

Why the wider Neometals story still matters to investors

Rinaldi is one thread within a diversified portfolio spanning gold, critical minerals and processing technology:

  • Barrambie Gold Project (100% NMT) — camp-scale gold project with Ironclad development pathway
  • Barrambie Titanium & Vanadium (100% NMT) — one of the world’s highest-grade hard-rock titanium deposits, currently in divestment process
  • Utah Brine Project (51% NMT) — lithium and potassium brine project in Utah, USA, with exclusive access to inactive gas wells and existing infrastructure
  • ELi Process™ lithium chemicals (70% NMT) — patented electrolysis technology targeting lowest-quartile cost production, with strategic MoU with Rio Tinto
  • Vanadium Recovery (86.1% via Novana Oy) — hydrometallurgical processing technology, advancing project financing for first commercial plant in Pori, Finland

A single drillhole result — even a disappointing one — does not define the company’s exploration thesis or its broader asset base. The T2 target remains untested, the pending assays may yet return material results, and the diamond tail scheduled for September gives management a second shot at depth. For investors tracking Neometals, this is a disciplined exploration process playing out in real time, not a failed campaign.

Wondering What Neometals Is Planning Next at Barrambie?

Whilst the Rinaldi RC hole returned no significant intersection in the tested interval, the T2 DDIP target remains untested and a diamond tail is scheduled for September 2026. Pending assays, surface geochemistry and magnetic surveys are all underway as part of a broader exploration strategy across the 100%-owned Barrambie Gold Project.

For full details on Neometals’ upcoming drill programmes, pending assay results and the broader Barrambie exploration pipeline, visit the Neometals investor centre. The company’s latest announcements, project timelines and critical minerals portfolio are all updated in real time.


Frequently Asked Questions

What did Neometals' Rinaldi Copper drilling results show?

RC drillhole 26RCRC006 at the Rinaldi Copper prospect returned no significant copper, gold or silver values across the 78–124m interval tested on an expedited basis. Assays for the upper 0–78m interval are still pending, and the hole was abandoned at 124 metres due to water ingress before reaching its planned depth.

What is the T2 DDIP target at Barrambie and why does it matter?

The T2 DDIP target is a modelled chargeability anomaly identified through dipole-dipole induced polarisation geophysics, a method that detects buried sulphide minerals associated with copper deposits. The RC hole failed to reach this target, which is why Neometals has scheduled a diamond drill tail for September 2026 specifically to test it.

Why was the Neometals RC drillhole abandoned before reaching its target depth?

Drillhole 26RCRC006 was discontinued at 124 metres — approximately 50 metres short of its planned target depth — due to water ingress that prevented further drilling. The company plans to use a diamond drill tail in September 2026 to complete the programme and test the T2 DDIP target.

What other assay results are still pending from Neometals' Barrambie programme?

Two sets of assays remain outstanding: the 0–78m interval from drillhole 26RCRC006 at the Rinaldi copper prospect, and gold analysis across 662 metres from five RC holes drilled at the Ironclad deposit. Both are expected to be reported once received, compiled and validated.

Does the Rinaldi drilling result affect Neometals' broader asset portfolio?

The Rinaldi result is specific to one RC hole at one copper prospect within the Barrambie Gold Project, which is itself one of five distinct assets in Neometals' portfolio. The company also holds the Ironclad gold development with a 50:50 profit-sharing JV, a titanium and vanadium deposit in divestment, a Utah brine project, a patented lithium electrolysis technology with a Rio Tinto MoU, and a vanadium recovery technology advancing toward commercial production in Finland.

William Hadrian
By William Hadrian
Partnerships Director
William supports Discovery Alert subscribers across Australia and overseas, helping them tailor alerts, troubleshoot technical issues, and optimise platform settings to suit their workflow.
Learn More
Companies Mentioned in Article

Breaking ASX Alerts Direct to Your Inbox

Join +30,000 subscribers receiving alerts.
Join thousands of investors who rely on Discovery Alert for timely, accurate mining and commodities market intelligence.