Lightning Minerals Phase 2 Drilling Advances at Mt Turner Ahead of Assays

Lightning Minerals Mt Turner drilling is hitting mineralisation at the depths its model predicted, putting the Drummer Fault on track for a 2027 maiden gold resource with assays due from November.
By William Hadrian -
  • Phase 2 drilling at Mt Turner is on schedule, with mineralised zones intersected at the depths the geological model predicted.
  • The evidence is visual only, so grades, widths and economic significance stay unproven until assays land, with progressive results expected from November.
  • The four-hole, roughly 650-metre program tests a priority section of a 14-kilometre Drummer Fault gold corridor.
  • Phase 2 builds on end 2025 drilling in which 8 of 9 holes intersected breccia-hosted gold below the historical oxide pits.
  • A maiden JORC gold resource is targeted for calendar year 2027, subject to results, further work, funding and JORC requirements.
Summarise with AI:

Mt Turner Phase 2 drilling advances toward 2027 maiden gold Mineral Resource Estimate

Lightning Minerals (ASX: L1M) is advancing Phase 2 diamond drilling at its wholly owned Mt Turner Project in North Queensland, with the program progressing on schedule in excellent drilling and site conditions. The work is a step towards a maiden gold Mineral Resource Estimate (MRE) targeted for calendar year 2027.

The early signal is geological rather than numerical. The technical team reports that mineralised zones have been intersected at depths predicted by the geological model, which the company says provides early support for its geological interpretation.

These are visual field observations only, and assays are pending. Nothing in the update establishes grades, widths or economic significance, so treat it as a progress marker, not a result.

The maiden MRE target remains subject to results and further work. Key facts from the update:

  • A four-hole program of approximately 650 metres
  • A 14-kilometre Drummer Fault gold corridor
  • GeoDrill as the drilling contractor
  • Progressive assay results expected from November

Troy Brice, Managing Director

“…it is encouraging to see visible geology consistent with our model.”

What is Phase 2 testing along the Drummer Fault?

Program design

The program tests strike and depth extensions to known gold mineralisation on a priority section of the Drummer Fault corridor. It also aims to improve understanding of structural controls and refine the design of subsequent infill drilling.

For investors, the logic is straightforward. Demonstrating continuity of mineralisation along strike and at depth is, in the company’s words, fundamental to establishing the potential scale of the Drummer Fault system.

Building on the end 2025 drilling

Phase 2 builds on the company’s end 2025 drilling, in which 8 out of 9 holes intersected breccia-hosted gold mineralisation below the historical oxide pits. Those results were covered in ASX announcements dated 21 October 2025, 10 November 2025 and 17 November 2025.

The Mt Turner exploration programme first set out the high-priority gold targets ahead of drilling, framing the work that Phase 2 now extends.

Core handling and logging

Systematic core logging and sampling are underway, with assay submission planned to occur progressively. The photographs in the announcement document operational activities only and are not evidence of grade.

What is a maiden JORC Mineral Resource Estimate?

A maiden MRE would be the first JORC Code-reported measure of gold mineralisation at Mt Turner. The JORC Code is the Australian standard for publicly reporting mineral resources.

Lightning describes a maiden MRE as a key value milestone. For you as an investor, it marks the shift from drilling that suggests mineralisation to a formally quantified estimate of it.

The company says the following will still be required:

  1. Further drilling
  2. Assays
  3. Geological modelling
  4. Competent Person assessment

Timing and achievement of an MRE remain subject to exploration results, sufficient data, funding and satisfaction of the applicable JORC requirements.

Pathway to 2027 Maiden MRE

What are the next steps and what should investors watch?

The company set out four next steps:

  1. Complete the planned Phase 2 drilling sequence
  2. Continue systematic geological logging, sampling and laboratory assessment
  3. Integrate results into the geological model and determine priorities for follow-up drilling
  4. Progressive assay results expected from November

Assays are the next key data point. Laboratory results are required to confirm grade and width, which is what turns visual observations into evidence.

Milestone Status Timing
Phase 2 drilling Underway, on schedule Planned hole sequence in progress
Assays Pending Progressive results expected from November
Maiden MRE Targeted Calendar year 2027, subject to results and further work

Mt Turner sits within the Etheridge Goldfield in North Queensland. Current exploration is focused on the Drummer Fault corridor and other priority targets within the broader Mt Turner gold, copper and molybdenum project.

Want the Next ASX Gold Breakout in Your Inbox?

Get FREE breaking ASX gold news within minutes of release, complete with in-depth analysis and the full announcement. Join 30,000+ subscribers who stay ahead of the market with Big News Blast. Click the “Free Alerts” button now to receive real-time alerts the moment market-moving news breaks.


Frequently Asked Questions

What is a maiden JORC Mineral Resource Estimate?

A maiden MRE is the first JORC Code-reported measure of mineralisation at a project, with the JORC Code being the Australian standard for publicly reporting mineral resources. Lightning Minerals is targeting one for Mt Turner in calendar year 2027.

What is Lightning Minerals drilling at Mt Turner?

Lightning Minerals is running a four-hole, roughly 650-metre Phase 2 diamond program testing strike and depth extensions to known gold mineralisation along the Drummer Fault corridor in North Queensland. GeoDrill is the drilling contractor.

When will Mt Turner Phase 2 assay results be released?

Progressive assay results from Phase 2 are expected from November. Assays are needed to confirm grade and width, since current observations are visual only.

What did the earlier Mt Turner drilling find?

In end 2025 drilling, 8 out of 9 holes intersected breccia-hosted gold mineralisation below the historical oxide pits. Results were reported on 21 October, 10 November and 17 November 2025.

What should investors watch next at Lightning Minerals?

The next key data point is the assay results from November, followed by integration into the geological model and decisions on follow-up drilling. The maiden MRE remains subject to results, funding and JORC requirements.

William Hadrian
By William Hadrian
Partnerships Director
William supports Discovery Alert subscribers across Australia and overseas, helping them tailor alerts, troubleshoot technical issues, and optimise platform settings to suit their workflow.
Learn More
Companies Mentioned in Article

Breaking ASX Alerts Direct to Your Inbox

Join +30,000 subscribers receiving alerts.
Join thousands of investors who rely on Discovery Alert for timely, accurate mining and commodities market intelligence.

About the Publisher