Emetals Drills First Holes at Utah Tungsten Project Targeting Critical Mineral Supply Gap

eMetals Limited (ASX: EMT) has put the drill bit in the ground at its Mineral Range Tungsten Project in Utah, launching a 17-hole, HQ diamond core program across five pads to test high-grade tungsten skarn mineralisation — with assay results expected within weeks.
By William Hadrian -
  • eMetals has commenced drilling at its 100%-owned Mineral Range Tungsten Project in Utah, USA, just six months after acquiring the project in April 2026.
  • The program comprises 17 drillholes across five drill pads, using HQ diamond core methodology to depths of 50–200 metres, with a planned duration of 5–6 weeks.
  • Drill Pad 1 targets strike and depth extensions of the known tungsten mineralised horizon adjacent to the historical Garnet mine, which reported production of 634 tonnes at 0.64% WO₃.
  • The project covers 109 mineral claims across 838 hectares with approximately 12 kilometres of strike length, providing multiple exploration prospects beyond the initial drill targets.
  • All core samples will be dispatched to ALS in Reno, Nevada upon program completion, with assay results to be reported to the ASX market shortly after — representing the key near-term catalyst window for investors.
Summarise with AI:

Drill bit hits the ground at eMetals’ Mineral Range Tungsten Project

eMetals Limited (ASX: EMT) has commenced drilling at its Mineral Range Tungsten Project in Utah, USA, targeting high-grade tungsten mineralisation within carbonate-skarn beds adjacent to the Mineral Range Batholith. The project, acquired in April 2026, has moved to the drill stage within approximately six months of acquisition, a timeline the company’s Executive Director attributed to strong local partnerships and a stable regulatory environment.

The Mineral Range Tungsten Project is eMetals’ critical metals asset, comprising a 100% interest in 109 mineral claims covering 2,072 acres (~838 hectares) of the Mineral Range Batholith in Beaver County, with approximately 12 kilometres of strike length providing multiple exploration prospects.

Mathew Walker, Executive Director, eMetals Limited

“Following extensive initial field work and reconnaissance in the past few months, we are delighted to commence the drilling of the Mineral Range Tungsten Project so soon after announcing the acquisition of the Project early in April this year. This is a credit to our local partners and to the favourable and stable regulatory environment in Utah, USA.”

Program design and what the company is targeting

Drill program at a glance

The current program is structured to deliver systematic geological and assay data across the Mineral Range mineralised corridor. Key parameters include:

  • 17 drillholes across five drill pads
  • Depths ranging from approximately 50 to 200 metres
  • HQ diamond core drilling methodology, providing high-quality geological, structural, and assay data
  • Expected duration of 5 to 6 weeks
  • All assays to be dispatched to ALS in Reno, Nevada upon program completion
  • Drilling conducted by experienced contractor TonaTec Exploration

Drill Pad 1 is the first in the sequence, with three holes planned from this pad to test the strike and depth extensions of the known tungsten mineralised horizon adjacent to the historical Garnet mine. That mine reported historical production of 634 tonnes @ 0.64% WO₃ (Crawford & Buranek, 1957), which serves as a reference point for the known mineralised horizon — not a resource or reserve estimate.

Mineral Range Tungsten Project & Drill Program Dashboard

All holes are designed to intersect the target horizon perpendicular to strike, providing an effective test of mineralisation geometry and continuity.

Parameter Detail
Drillholes 17
Drill Pads 5
Depth Range ~50–200 metres
Drilling Method HQ Diamond Core
Assay Laboratory ALS, Reno, Nevada

Why tungsten is attracting investor attention

Tungsten is one of the densest and hardest metals on earth, with the highest melting point of any element. Those properties make it indispensable across a range of demanding applications: cutting tools and drill bits used in mining and manufacturing, armour-piercing ammunition and defence systems, electronics, and energy components. There is no straightforward substitute when the application demands extreme hardness or heat resistance.

That industrial importance is why tungsten appears on the critical minerals lists of multiple Western governments. The concern is supply concentration: China accounts for the large majority of global tungsten production and refining capacity, leaving Western manufacturers heavily dependent on a single source. Any disruption to that supply chain, whether from trade policy or geopolitical tension, has few near-term alternatives.

A tungsten skarn deposit forms when heat and fluids from an intruding granite body chemically alter the surrounding carbonate rocks, concentrating metals in the process. The Mineral Range Batholith in Utah is considered geologically favourable for exactly this style of mineralisation, which is why the region has a documented history of tungsten mining, including several past-producing mines.

eMetals holds a 100% interest in 109 mineral claims across approximately 838 hectares, with roughly 12 kilometres of strike length to systematically evaluate across multiple exploration prospects.

What comes next for eMetals

The next 5 to 6 weeks represent the immediate catalyst window investors should watch. As drilling progresses across the five pads, core samples will be dispatched to ALS in Reno, Nevada for assay analysis upon completion of the program. The company is expected to report results to the market via ASX announcement following that dispatch.

With 17 holes spread across five separate drill pads, the program is structured to generate assay data once the full drilling program is complete.

The project remains under 100% eMetals ownership, in a regulatory environment that management has described as “favourable and stable.” Assay results will provide independent data from this project under eMetals’ ownership, and the market will be watching closely to see how the mineralisation compares to the historical reference points that originally drew the company to the Mineral Range.

Don’t Miss the Next Critical Metals Discovery

Get FREE breaking ASX news delivered to your inbox within minutes of release, complete with in-depth analysis. Join 30,000+ subscribers already staying ahead of the market with Big News Blast. Click the “Free Alerts” button to receive alerts the moment critical metals and mining news breaks on the ASX.


Frequently Asked Questions

What is the Mineral Range Tungsten Project and where is it located?

The Mineral Range Tungsten Project is a 100%-owned eMetals asset comprising 109 mineral claims across approximately 838 hectares in Beaver County, Utah, USA, targeting high-grade tungsten mineralisation within carbonate-skarn beds adjacent to the Mineral Range Batholith.

What is tungsten used for and why is it considered a critical mineral?

Tungsten is used in cutting tools, drill bits, defence systems, electronics, and energy components due to its extreme hardness and highest melting point of any element — and it appears on Western governments' critical minerals lists because China controls the large majority of global production and refining capacity.

How many holes is eMetals drilling at Mineral Range and when will results be available?

eMetals is drilling 17 HQ diamond core holes across five drill pads, with the program expected to take 5–6 weeks; all core samples will be dispatched to ALS in Reno, Nevada upon completion, with assay results reported to the ASX market shortly after.

What historical mining evidence exists at the Mineral Range Tungsten Project?

The historical Garnet mine, adjacent to the first drill pad, reported production of 634 tonnes at 0.64% WO₃ (Crawford & Buranek, 1957), which serves as a reference point for the known mineralised horizon — though this is not a current resource or reserve estimate.

How quickly did eMetals move from acquiring the Mineral Range project to drilling?

eMetals acquired the Mineral Range Tungsten Project in April 2026 and commenced drilling approximately six months later, a timeline the company's Executive Director attributed to strong local partnerships and a stable regulatory environment in Utah.

William Hadrian
By William Hadrian
Partnerships Director
William supports Discovery Alert subscribers across Australia and overseas, helping them tailor alerts, troubleshoot technical issues, and optimise platform settings to suit their workflow.
Learn More
Companies Mentioned in Article

Breaking ASX Alerts Direct to Your Inbox

Join +30,000 subscribers receiving alerts.
Join thousands of investors who rely on Discovery Alert for timely, accurate mining and commodities market intelligence.

About the Publisher