EV Resources Confirms Four New Feeder Veins at Los Lirios Antimony Project
EV Resources Ltd (ASX: EVR) has reported high-grade underground channel sampling results from the Los Lirios Antimony Project in Mexico, confirming very shallow, continuous antimony mineralisation within a strata-bound Carbonate Replacement Deposit (CRD) horizon. EV Resources Los Lirios antimony grades up to 25.2% Sb have now been confirmed across multiple historical workings, with grades reported up to 25.2% Sb over 0.9 metres and multiple channels above 10% Sb across four World War II-era adits and one pit exposure.
According to the ASX announcement dated 30 June 2026, these results are considered by EV Resources Ltd to materially de-risk the geological model, provide a structural vectoring tool for Phase 2 drilling, and support work already underway towards a maiden JORC Mineral Resource Estimate (MRE) targeted for Q4 CY2026.
"These results give us confirmation of the relationship between feeder structures and high-grade antimony, which is consistently hosted within the CRD unit proximal to the structures. Grades up to 25.2% Sb confirm the quality of this system, and just as importantly, we have confirmed structures as a tool to vector towards higher grades within the CRD as we move to Phase 2 drilling. At a time when Western governments and defence industries are scrambling for antimony outside of China, every metre of high-grade continuity we confirm at Los Lirios strengthens our position to help solve the supply gap," said Mike Brown, Managing Director and CEO of EV Resources Ltd.
EV Resources Ltd reports that a total of 54 channel samples were collected across four historical underground workings in the Lirios 1 block: Mina San Rafael, Mina Guadalupana, Mina Linda Vista and Mina San Pedro. Sampling was designed to be perpendicular to the mineralised faces to approximate true widths.
The channel sampling confirms:
For investors, the implications highlighted by the announcement are:
At Mina Guadalupana, the underground workings follow the San José replacement body for approximately 38 to 40 metres of mapped development.
Geological setting
Selected channel results from Guadalupana
| Sample ID | Thickness (m) | Sb grade (%) |
|---|---|---|
| 856939 | 1.3 | 19.70 |
| 856948 | 1.3 | 17.20 |
| 856945 | 0.7 | 16.10 |
| 856965 | 0.6 | 13.95 |
| 856943 | 0.7 | 8.59 |
| 856942 | 0.7 | 4.48 |
These intercepts, located within a consistent stratabound unit, support EV Resources Ltd's interpretation of a laterally continuous, high-grade CRD horizon.
Mina San Pedro is situated in the south-western part of the property. The adit tracks approximately 32 metres of underground development and is located where a vertical fault vein intersects the relatively flat-lying CRD unit.
Geological setting
Selected channel results from San Pedro
| Sample ID | Thickness (m) | Sb grade (%) |
|---|---|---|
| 856934 | 1.0 | 13.85 |
| 856929 | 1.0 | 12.75 |
| 856930 | 0.6 | 5.57 |
| 856931 | 0.9 | 2.92 |
| 856935 | 0.85 | 3.38 |
These results provide further support for the link between high-grade antimony, the CRD unit and proximity to structural conduits.
The Linda Vista adit is a shorter 12 metre accessible drive that tests the northern margin of the system.
Geological setting
The announcement notes that Linda Vista has returned some of the highest grades to date from feeder structures at Los Lirios.
Selected channel results from Linda Vista
| Sample ID | Thickness (m) | Sb grade (%) |
|---|---|---|
| 856928 | 0.5 | 14.35 |
| 856926 | 0.5 | 11.35 |
| 856927 | 0.5 | 4.45 |
| 856924 | 0.3 | 4.74 |
These results highlight the importance of the structural-lithological interface and indicate that structures themselves may host very high antimony grades.
San Rafael presents a combination of structural fault-veining and stratiform replacement within the CRD horizon.
Geological setting
Selected channel results from San Rafael
| Sample ID | Thickness (m) | Sb grade (%) |
|---|---|---|
| 856921 | 0.5 | 10.65 |
| 856919 | 0.5 | 7.03 |
| 856916 | 0.55 | 5.07 |
| 856918 | 0.8 | 4.67 |
| 856917 | 0.9 | 4.13 |
| 856911 | 0.9 | 3.80 |
These results are consistent with the broader model of a feeder-controlled CRD system, with high-grade mineralisation close to structural zones.
Outside the underground workings, one of the most outstanding channel results was obtained from a pit wall at Pit 1, within the San José CRD horizon.
Key pit result
| Sample ID | Location | Thickness (m) | Sb grade (%) |
|---|---|---|---|
| 856908 | Pit 1 | 0.9 | 25.20 |
According to EV Resources Ltd, this is the highest antimony grade reported so far at Los Lirios, reinforcing the high-grade character of the system.
The announcement repeatedly refers to Los Lirios as a Carbonate Replacement Deposit (CRD) system. For investors without a geology background, it may be useful to break this down in simple terms.
A Carbonate Replacement Deposit is a type of mineral deposit that forms when hot, mineral-rich fluids move through the Earth's crust and react with carbonate rocks, such as limestone or dolomite.
Key points:
At Los Lirios:
According to EV Resources Ltd's technical description:
Feeder structures
Near-vertical faults and fracture zones act as conduits for hydrothermal fluids carrying dissolved antimony.
Reactive limestone horizon (San José CRD unit)
When these fluids intersect the favourable limestone layer, they spread out along the bedding plane and chemically replace the rock, forming a flat-lying or gently dipping mineralised body.
Gypsum cap acting as a seal
An overlying gypsum layer is interpreted to have limited vertical movement of the fluids. This helped to trap fluids in the limestone horizon and encouraged lateral replacement, giving the system a "cap and seal" style geometry.
Grade distribution
The intensity of silicification and antimony mineralisation is typically strongest close to feeder structures and gradually decreases away from them. Channel samples show that, while local grade variations occur, alteration and mineralisation are consistent across the unit at the larger scale.
For investors looking at EV Resources Ltd, several points from this model are relevant:
Repeatable target horizon
The mineralised CRD unit consistently sits beneath a gypsum cap, providing a clear stratigraphic marker for drilling.
Potential lateral extent
CRD systems can extend laterally along favourable units. The continuity observed across four adits supports the potential for broader extents, subject to further exploration.
Drill targeting efficiency
With feeder structures acting as "vectoring tools", future drilling can be focused on zones near structural intersections with the CRD horizon, which may improve the likelihood of intersecting higher grades.
| Term | Simple explanation |
|---|---|
| CRD (Carbonate Replacement Deposit) | A deposit where hot fluids replace limestone or other carbonate rocks with metal-bearing minerals. |
| Stibnite | A grey metallic mineral (Sb₂S₃) and the main ore of antimony at Los Lirios. |
| Cervantite / Stibiconite | Yellow to brown secondary antimony oxide minerals formed when stibnite weathers near surface. |
| Feeder structure | A fault or fracture that allowed mineral-rich fluids to move upward and into host rocks. |
| Strata-bound | Mineralisation confined to a specific rock layer. |
| True width | The actual thickness of a mineralised zone, measured at right angles to its plane. |
| Channel sample | A continuous sample cut across a rock face using a saw to provide a representative grade over a given width. |
The ASX announcement places strong emphasis on the sampling method and how it relates to grade reliability.
EV Resources Ltd describes the following approach:
Samples were then sent to CHEMEX (Zacatecas) for preparation and to ALS (Vancouver) for analysis using ICP-AES and, where required, lithium borate fusion XRF to improve accuracy on very high-grade stibnite-rich samples. A QA/QC program with blanks, duplicates and standards was applied throughout.
The company notes that antimony at Los Lirios is present predominantly as brittle, fine-grained stibnite. In conventional diamond drilling:
By contrast, channel sampling removes mineralised material directly from the face with no drilling fluids involved, meaning fine-grained, high-grade material remains within the sampled volume. EV Resources Ltd states that the recovery and representativity of these channel samples is considered as good as, or better than, diamond drilling for this specific environment. These data are consequently expected to provide a robust baseline for future resource modelling.
The announcement places the Los Lirios results within the broader context of global antimony supply. Key points referenced include:
EV Resources Ltd positions itself as a critical minerals exploration and development company focused on antimony, with several key assets:
This broader portfolio indicates that EV Resources Ltd is targeting a position in the North American and allied antimony supply chains, with Los Lirios as a key exploration and potential development asset.
The ASX announcement outlines three main workstreams that will follow from the channel sampling program.
| Activity | Description | Status / timing (per announcement) |
|---|---|---|
| Phase 2 surface diamond drilling | Use of a second portable rig to test shallow CRD extents at Lirios 1 (east, south-east and south), Cofradia high-grade structures and Lirios 2 CRD zones. Portable rigs aim to limit the need for new access roads. | Phase 2 planning reported as well advanced; to follow Phase 1 drilling. |
| Structural mapping | Continued mapping of surface structures to refine the vectoring model and identify additional high-grade targets within the CRD. | To run in parallel with drilling. |
| Resource estimation modelling | Integration of the 54 underground channels with historical data and ongoing drilling to build a spatial model and support a maiden JORC Resource. | Maiden JORC MRE targeted for Q4 CY2026. |
Phase 2 drilling is expected by EV Resources Ltd to test the concept that the highest grades are located near ENE and NNW trending feeder structures within the San José horizon, a pattern strongly supported by the channel data
With standout channel sampling results of up to 25.2% Sb confirmed at the Los Lirios Antimony Project, a validated geological model, and a maiden JORC Mineral Resource Estimate targeted for Q4 CY2026, EV Resources Ltd (ASX: EVR) is advancing rapidly through a pivotal stage of project development. To learn more about the company, its flagship Mexican antimony project, and its broader North American critical minerals portfolio, visit evresources.com.au.