Kali Metals Uncovers High-Grade Tin-Tungsten System at Mt Cudgewa, Victoria
Kali Metals Ltd (ASX: KM1) has reported the first assay results from its Phase II drilling program at the Marble Bar Gold Project in Western Australia. The Kali Metals Marble Bar gold drilling results at Tiger II confirm that gold mineralisation continues down dip from previously reported Phase I intercepts, representing an important early milestone for the program.
According to the ASX announcement, the results come from a completed program totalling 4,059 m of reverse circulation (RC) drilling and 281.7 m of diamond drilling, supported by an extensional soil sampling program. Remaining RC, diamond and soil assays are still to be received.
The Phase II drilling program at Marble Bar is described as being designed to achieve two main goals:
According to Kali Metals Ltd, the recently completed program comprised:
Phase II directly follows the Phase I program completed in December 2025, which reported an intersection of 2 m at 4.1 g/t gold from 17 m at Tiger II (ASX: KM1, 29 January 2026).
The first batch of Phase II assays relates to six vertical RC holes at Tiger II:
Diamond drilling results and the bulk of RC and soil sampling assays are yet to be reported and are expected to be released progressively.
According to the announcement, the key technical outcome from Tiger II is that mineralisation has been intersected down dip of the Phase I results, with similar widths and grades using a 0.5 g/t gold cut-off.
Reported significant intercepts at Tiger II
| Hole ID | From (m) | To (m) | Width (m) | Grade (g/t Au) |
|---|---|---|---|---|
| MBRC079 | 29 | 31 | 2 | 1.6 |
| MBRC080 | 29 | 31 | 2 | 1.6 |
| MBRC080 | 34 | 37 | 3 | 0.6 |
| MBRC080 | 47 | 49 | 2 | 1.6 |
| MBRC081 | 41 | 44 | 3 | 3.6 |
| MBRC082 | 41 | 46 | 5 | 1.0 |
The standout interval is reported in MBRC081, with:
Furthermore, the company reports that:
This geological style is consistent with previous Marble Bar work and supports the current targeting model applied by Kali Metals Ltd across the project.
Managing Director commentary
"The Phase II drilling program is focused on advancing our understanding of the Marble Bar gold system by both tightening drill spacing across the key Sherman, Churchill and Tiger prospects, and testing for extensions at depth. These early results demonstrate that gold mineralisation of similar width and tenor, continues down dip of the surface-lying Phase I results. The presence of thicker zones of alteration are indicative of the potential of the system to expand at depth."Paul Adams, Managing Director, Kali Metals Ltd
In the Marble Bar announcement, Kali Metals Ltd refers to "down-dip extensions" at Tiger II. In simple geological terms:
Drilling to test down dip is, consequently, a way to check whether a gold-bearing zone continues below earlier, shallower intercepts.
Down-dip continuity is often a key input for building a future Mineral Resource Estimate (MRE). For a gold deposit to support a potential resource:
By reporting that Tiger II mineralisation is open down dip and that similar grades and widths to surface intercepts have been intersected at depth, the Kali Metals Marble Bar gold drilling results at Tiger II signal that:
This does not constitute a resource at this stage but, however, outlines why confirming mineralisation at depth is an important step in early-stage exploration.
The Phase II program at Marble Bar combines RC drilling and diamond drilling. For non-specialists, the methods can be summarised as follows.
Reverse circulation (RC) drilling
Diamond drilling
According to the ASX release, diamond drilling results from Phase II are still pending and are expected in July 2025. These core results are likely to help refine the geological model at Marble Bar and cross-check RC data quality.
| Term | Simple explanation |
|---|---|
| RC drilling | A drilling method that returns broken rock chips to the surface for sampling. |
| Diamond drilling | A drilling method that cuts a solid cylinder of rock, known as core. |
| g/t Au | Grams of gold per tonne of rock, the standard way to express gold grade. |
| Cut-off grade | The minimum grade used for reporting an intercept. Here, 0.5 g/t gold. |
| Potassic alteration | Rock chemically changed by potassium-rich minerals, often associated with gold. |
| Open down dip | Drilling has not yet defined the lower limit of the mineralisation at depth. |
| MRE | Mineral Resource Estimate, a formal JORC-compliant resource calculation. |
The ASX announcement sets out a series of activities planned for Q1 FY27, indicating that assay and field results will continue to be released over the short term. According to Kali Metals Ltd, these include:
Remaining Marble Bar drilling assays — Receipt and interpretation of the rest of the RC and diamond drilling results from Marble Bar. These data are expected to clarify the extent and continuity of mineralisation at the Sherman, Churchill and Tiger prospects.
Peggy and Florence soils and rock chips — Receipt and interpretation of soil sampling and rock chip results over the Peggy and Florence tenements. The aim is to test whether known gold trends extend into these recently acquired areas.
High-resolution hyperspectral survey — Acquisition and interpretation of a high-resolution hyperspectral survey across Marble Bar and DOM's Hill tenement package. Hyperspectral surveying uses spectral imaging to identify alteration minerals on the surface that may indicate buried mineral systems, and these results can be used to generate new exploration targets.
Mt Cudgewa soils (Victoria) — Release of soil sampling results from Mt Cudgewa in the Southern Lachlan Fold Belt (Victoria). This supports Kali Metals Ltd's broader gold exploration portfolio outside Western Australia.
Higginsville Lithium Project drilling campaign — Initiation of the 2026 drilling and field campaign at the Higginsville Lithium Project. This signals renewed field activity on Kali Metals Ltd's lithium assets alongside its ongoing gold exploration.
For investors, this activity list implies that news flow in the near term will not be restricted to a single project or commodity, with gold and lithium results both scheduled.
The announcement reiterates that Kali Metals Ltd holds a 4,029 km² exploration portfolio that is prospective for gold, lithium and critical minerals across:
Within this wider portfolio, Marble Bar currently functions as an early-stage gold project where the company is testing the continuity and extent of a granitic-hosted gold system. Furthermore, it is using a combination of RC, diamond drilling, soils, rock chips and hyperspectral surveys, aiming to define areas that may, subject to further success, support future resource estimation work.
The Higginsville Lithium Project provides a separate pipeline of lithium-focused work, with a 2026 campaign planned, which may appeal to investors seeking exposure to both precious and battery metals via a single ASX issuer.
From an investment perspective, several data points in the Phase II update may be of interest to shareholders and potential investors tracking Kali Metals Ltd.
The Kali Metals Marble Bar gold drilling results at Tiger II have intersected gold mineralisation below the Phase I intercept, using a consistent 0.5 g/t cut-off. Intervals such as 3 m at 3.6 g/t gold from 41 m (MBRC081) and 5 m at 1.0 g/t gold from 41 m (MBRC082) demonstrate that mineralisation persists at depth, with grades remaining in a range that is often considered encouraging for further exploration.
The company reports that the mineralised system at Tiger II is open down dip, which means drilling has not yet closed off the mineralised zone at depth. Consequently, there is scope for further step-out drilling to continue testing deeper positions, subject to future work programs and funding.
The mineralisation is described as quartz veining with potassic alteration and sulphides, hosted in granodiorite within adamellite gneiss. This consistent geological signature can, in addition, help improve future targeting accuracy, as exploration teams refine models based on recurring patterns.
While no Mineral Resource Estimate has been declared for Marble Bar at this stage, the announcement notes that drill spacing and data quality are being designed to support potential future resource estimation. The current dataset is considered by the company to be appropriate for use in a possible MRE if further drilling continues to support continuity.
Kali Metals Ltd is active across gold and lithium projects in several Australian jurisdictions. This portfolio approach may disperse technical and exploration risk across different commodities and geological settings, although overall outcomes remain dependent on future exploration success.
The latest Marble Bar update positions Kali Metals Ltd as a junior explorer with a completed Phase II drilling program, confirmed down-dip gold mineralisation at Tiger II that remains open at depth, and a defined set of near-term catalysts.
For investors focused on early-stage gold and lithium exploration, the key questions over the coming months are likely to include:
The current announcement indicates that the Kali Metals Marble Bar gold drilling results at Tiger II represent one piece of a broader data-gathering phase, where multiple datasets are being assembled to inform future decisions on resource work, further drilling, and potential project prioritisation within its wider portfolio.
With down-dip gold mineralisation confirmed at Tiger II, an active multi-project pipeline, and a steady stream of near-term catalysts across both gold and lithium, Kali Metals Ltd (ASX: KM1) is shaping up as a junior explorer worth watching closely. To find out more about the company, its projects, and what the Phase II program could mean for investors, click here to watch the latest update.