Godolphin Resources Name Change Transforms Company Into Orbit Resources
Godolphin Resources (ASX: GRL) has announced a significant upgrade to its Lewis Ponds gold and silver deposit in the Lachlan Fold Belt, NSW, with 470,000 ounces of gold and 21 million ounces of silver now defined.
Godolphin Resources has delivered a game-changing mineral resource upgrade at its 100%-owned Lewis Ponds gold and silver deposit. The updated resource represents a substantial increase across all key metrics with 58% more tonnes, 18% more gold, and a massive 31% increase in silver content compared to the previous estimate.
The new Mineral Resource Estimate (MRE) defines a total Indicated and Inferred resource of 9.83 million tonnes at 1.49g/t gold and 66.15g/t silver, along with significant base metal credits of 2.46% zinc, 1.38% lead, and 0.15% copper.
This translates to a total metal content of:
The resource upgrade marks a critical step toward potential development, with a major portion now classified in the higher-confidence Indicated category, compared to the previous 100% Inferred classification.
A key breakthrough in the resource update is the definition of a potential open-pit component, following a detailed pit optimisation study. This creates a two-pronged development approach with both open-pit and underground resources now identified:
Open Pit Resource (1.0g/t AuEq cutoff):
Underground Resource (3.2g/t AuEq cutoff):
The identification of a near-surface open-pit component could significantly enhance project economics by providing earlier cash flow through a staged development approach.
"These results have considerably exceeded our expectations and highlight the exceptional potential for the Lewis Ponds project. Through infill drilling and improved geological understanding, we have significantly increased the global resource metal inventory," said Managing Director Jeneta Owens.
The Lewis Ponds deposit consists of multiple mineralised lodes hosted within a volcanic-sediment package. The primary volcanogenic mineralisation extends over a 1,500m strike length and dips steeply to the northeast, with three main mineralised zones identified:
The deposit remains open for further expansion, with several exploration targets identified that could drive additional resource growth.
For investors looking to understand the resource valuation, Lewis Ponds Gold-Silver by Godolphin Resources uses a gold equivalent (AuEq) calculation that accounts for all valuable metals in the deposit. The formula considers current metal prices and metallurgical recoveries, with a 1.0g/t AuEq cutoff applied to potential open-pit resources and a higher 3.2g/t AuEq cutoff for underground material.
Previous metallurgical testing indicates the mineralisation responds well to conventional flotation processing, producing two concentrates: a zinc concentrate and a lead-copper concentrate that captures most of the precious metals. Recovery rates from this testing were:
With the upgraded resource now in hand, Godolphin has outlined a clear path forward:
"Critically, this was achieved alongside increased mineral resource confidence. The addition of the proposed open pit resource also reiterates the potential for near-term development opportunities," added Jeneta Owens.
The Lewis Ponds project is emerging as one of Australia's significant undeveloped gold and silver resources, with several compelling investment attributes:
Substantial precious metals inventory: With 470,000oz gold and 21Moz silver, Lewis Ponds represents a significant precious metals asset in a tier-one mining jurisdiction
Development flexibility: The combination of open-pit and underground resources provides multiple development pathways and potential staging options
Resource growth potential: The deposit remains open in several directions with additional lodes identified for future drilling
Base metal credits: Significant zinc, lead and copper content provides valuable by-product credits that could enhance project economics
Infrastructure advantages: Located just 15km from Orange, NSW, the project benefits from excellent access to infrastructure, skilled workforce, and services
As Godolphin progresses the scoping mining study and continues metallurgical optimisation, investors can expect a steady flow of news that will further define the development pathway for this increasingly significant Australian gold and silver project.
Discover why savvy investors are taking notice of Godolphin Resources' (ASX: GRL) significant upgrade at the Lewis Ponds project. With 470,000 ounces of gold and 21 million ounces of silver now defined, plus newly identified open-pit potential, this could represent a compelling investment opportunity in the precious metals sector. Learn more about this emerging Australian gold-silver story and what's next on Godolphin's development pathway.