Aurum Extends BDT2 Gold Beyond Current Resource With High-Grade Hits at Depth

Aurum Resources has confirmed the Aurum Resources BDT2 Gold Extension remains open at depth and along strike, with high-grade hits outside the current resource boundary pointing to a meaningful ounce uplift in the Q3 CY2026 MRE update.
By William Hadrian -
Summarise with Ai:

Aurum extends BDT2 gold system with high-grade hits beyond current resource

Aurum Resources has announced the final batch of results from its step-out drilling programme at the BDT2 deposit, part of its 3.22Moz Boundiali Gold Project in Côte d’Ivoire. The drilling campaign comprises 10 diamond holes totalling 3,565.05m on 100m line spacing, designed to test strike and depth extensions beyond the current Mineral Resource Estimate boundaries.

The programme has successfully intersected gold mineralisation outside the existing MRE footprint, confirming that the system remains open at depth and along strike. Standout intercepts include 0.61m @ 47.60 g/t Au from 189.39m, 4.46m @ 4.23 g/t Au from 90.00m (incl. 0.50m @ 35.19 g/t Au), and 39m @ 0.79 g/t Au from 372.00m (incl. 3m @ 5.76 g/t Au). Aurum’s combined group resources now stand at 4.4Moz across its flagship Boundiali and 1.16Moz Napié projects.

What the drilling results show

These represent the final holes from the current BDT2 drilling campaign, drilled on 100m line spacing to define strike and depth limits. The programme’s key significance lies in confirming gold mineralisation beyond current MRE boundaries, signalling resource growth potential ahead of the next major update targeted for end Q3 CY2026.

True widths for these gold intercepts are estimated at approximately 60% to 85% of reported downhole lengths, based on the interpreted geometry of the mineralised zones.

Hole ID Intercept Grade (g/t Au) From (m) Notable Inclusion
DSDD0461 39m 0.79 372.00 incl. 3m @ 5.76 g/t
DSDD0477 0.61m 47.60 189.39
DSDD0471 4.46m 4.23 90.00 incl. 0.50m @ 35.19 g/t
DSDD0483 3m 4.02 124.00 incl. 2.30m @ 5.16 g/t
DSDD0486 15m 0.73 116.00 incl. 1m @ 4.20 g/t
DSDD0477 1m 9.93 367.00
DSDD0477 11.50m 0.69 382.00 incl. 1m @ 5.47 g/t
DSDD0481 12.63m 0.65 357.37 incl. 1m @ 3.12 g/t
DSDD0477 18m 0.43 198.00 incl. 1m @ 1.81 g/t

How these compare to earlier BDT2 drilling

The latest results build on a strong track record of significant intercepts from previous campaigns at BDT2. Earlier drilling returned standout intervals including:

  • 74m @ 1.00 g/t Au from 167m (incl. 1m @ 24.73 g/t Au)
  • 18m @ 3.93 g/t Au from 198m (incl. 5m @ 11.07 g/t Au)
  • 40.60m @ 1.06 g/t Au from 299.40m (incl. 6m @ 2.77 g/t Au)
  • 28m @ 1.54 g/t Au from 82m (incl. 4m @ 7.51 g/t Au)

These results confirm BDT2 as an established, growing deposit with a well-defined geological framework. The latest programme extends that footprint rather than defining it for the first time.

Why extensional drilling matters for gold investors

Extensional drilling refers to drill holes designed to test ground beyond the boundaries of a known resource. In simple terms, it seeks to prove that mineralisation continues outside the area already quantified in a resource estimate. When a company reports results from extensional drilling, it is signalling the potential to add ounces to the next resource update.

In Aurum’s case, the BDT2 programme has done exactly that. By intersecting gold mineralisation outside the current MRE envelope, the company has demonstrated that the deposit has not been closed off. The phrase “open at depth and along strike” means that drilling has not yet encountered the edges of the system, leaving room for further expansion through follow-up work.

Three reasons extensional hits matter to the investment case:

  1. Resource growth potential: Mineralisation beyond the MRE footprint feeds directly into the next resource update, potentially increasing the total ounce count.
  2. De-risking deposit scale: Proving continuity at depth and along strike demonstrates that the deposit is not isolated or thinning prematurely.
  3. Free milling gold and high recoveries: BDT2 sits within a 13km x 3km mineralised corridor of free milling gold, previously reported to achieve >95% recoveries in metallurgical testing. Expanding a deposit with these characteristics enhances economic viability.

A strong balance sheet funding an aggressive drill programme

Aurum’s exploration momentum is underpinned by a robust financial position and a self-owned drilling fleet, positioning the company to explore faster and more cost-effectively than peers reliant on contractor rigs.

Key funding and drilling metrics:

  • $54.7M cash (30 June 2026, unaudited)
  • 16 Aurum-owned diamond drill rigs now operating across the Boundiali tenements
  • 130,000m total drilling planned for CY2026, split between Boundiali (100,000m) and Napié (30,000m)
  • Rigs have now moved from BDT2 to neighbouring BST and BM tenements to test strike extensions and blind targets

Dr Caigen Wang, Managing Director

“With 16 diamond rigs owned by Aurum now active across Boundiali, we are executing one of the most aggressive and efficient drilling programmes in the region. Aurum has grown the Boundiali resource to 3.22Moz in a remarkably short timeframe, and these new results will feed directly into a major resource update targeted for the end of Q3 CY2026.”

The ownership model eliminates contractor mobilisation costs and scheduling constraints, enabling Aurum to pivot quickly between target areas and maintain a continuous drilling cadence throughout the year.

Aurum Resources: Financial & Operational Strength Dashboard

What’s next for Boundiali and Napié

Aurum has entered a phase of parallel development and exploration, with multiple near-term catalysts across both flagship projects and regional exploration activities.

Next Boundiali MRE update: Targeted for end Q3 CY2026, incorporating results from the current 100,000m programme across BD, BM, and BST tenements.

Boundiali DFS: Expected late CY2026, building on the Pre-Feasibility Study and Maiden Ore Reserve delivered in June 2026.

Napié resource expansion: A 30,000m diamond drilling programme is under way to grow the 1.16Moz resource. An exploration camp is being built near the deposits to reduce operating costs and improve access efficiency.

Regional exploration and discovery: Scout drilling is planned across the BD, BM, and BST tenements to test new targets identified via soil geochemistry and geological mapping. Aurum is also advancing its Encore JV and Major Star Plus partnership projects to identify new gold systems in the region.

Aurum is rapidly converting an aggressive, well-funded drilling strategy into resource scale, with a defined pathway from exploration toward development. The latest BDT2 results underscore the company’s ability to extend mineralisation at depth and along strike, feeding directly into a major resource update due in Q3 CY2026. With $54.7M in cash, 16 self-owned rigs, and multiple near-term catalysts across Boundiali and Napié, the company has positioned itself to deliver a steady flow of newsflow through the remainder of 2026.

Want the Next Gold Discovery in Your Inbox?

Join 20,000+ investors receiving FREE breaking ASX news within minutes of release, complete with expert analysis. Click the “Free Alerts” button at StockWire X to get real-time alerts on gold exploration, resource updates, and drilling results the moment they hit the market.


Frequently Asked Questions

What is extensional drilling and why does it matter for gold resource growth?

Extensional drilling tests ground beyond the boundaries of a known resource to prove mineralisation continues outside the area already quantified. When results confirm gold beyond the existing resource envelope, as Aurum has done at BDT2, it signals potential ounce additions in the next resource update.

What were the best drill results from Aurum's BDT2 step-out programme?

Standout intercepts from the final batch of BDT2 step-out holes include 0.61m at 47.60 g/t Au from 189.39m, 4.46m at 4.23 g/t Au from 90m including 0.50m at 35.19 g/t Au, and 39m at 0.79 g/t Au from 372m including 3m at 5.76 g/t Au.

When is Aurum Resources' next Boundiali resource update expected?

Aurum has targeted the end of Q3 CY2026 for its next major Boundiali Mineral Resource Estimate update, which will incorporate results from the current 100,000m drilling programme across the BD, BM, and BST tenements.

How many drill rigs does Aurum Resources own and operate at Boundiali?

Aurum owns and operates 16 diamond drill rigs across the Boundiali tenements, eliminating contractor costs and scheduling delays and enabling the company to run one of the most aggressive drilling programmes in the region.

What is Aurum Resources' total gold resource across its projects?

Aurum's combined group resources stand at 4.4Moz, comprising 3.22Moz at the Boundiali Gold Project and 1.16Moz at the Napié project, both located in Côte d'Ivoire.

William Hadrian
By William Hadrian
Partnerships Director
William supports Discovery Alert subscribers across Australia and overseas, helping them tailor alerts, troubleshoot technical issues, and optimise platform settings to suit their workflow.
Learn More
Companies Mentioned in Article

Breaking ASX Alerts Direct to Your Inbox

Join +30,000 subscribers receiving alerts.
Join thousands of investors who rely on Discovery Alert for timely, accurate mining and commodities market intelligence.