White Cliff Minerals Hits Copper on Untested 2.8km Structure Beside Danvers 1 [VIDEO]

White Cliff Minerals' Danvers discovery opens a new 2.8km copper structure beside Danvers 1, with sulphides from just 16m down and assays due in 6-8 weeks.

By William Hadrian -

Key Takeaways

  • DAN26053, the first hole into an untested parallel structure, intersected 28.52m of visual copper sulphides from just 16m downhole, opening a 2.8km target less than 200m from Danvers 1.
  • All three north-east infill holes hit copper sulphides across 1,397m of lateral strike, extending the mineralised footprint over 2.3km north-east of core Danvers 1.
  • Every sulphide figure is a visual estimate, not an assay, and laboratory results are due in 6-8 weeks as the next value catalyst.
  • An earlier assay of 76.5m at 2.01% Cu from DAN26047 shows the grade this system has delivered, though it is separate from the visual estimates.
  • A 72km airborne survey and till sampling at Thor and Rocket are underway, with drilling feeding a maiden Exploration Target and Mineral Resource Estimate for Danvers 1.
This is a special feature video produced for our partner.

Breaking ASX Alerts Direct to Your Inbox

Join +30,000 subscribers receiving alerts.
Join thousands of investors who rely on Discovery Alert for timely, accurate mining and commodities market intelligence.

About the Publisher