Minerals 260 Grade Control Drilling Backs 6.2Moz Gold Resource Ahead of Feasibility Study

Minerals 260 Bullabulling Gold Project grade control drilling matches the 6.2Moz resource model, with a standout 1.1m @ 290g/t Au at Bacchus lighting up the high-grade debate ahead of the DFS.
By William Hadrian -
  • Initial grade control drilling of 320 RC holes on 10m x 10m spacing, including 39 twin-hole pairs, shows grades consistent with the 6.2Moz Bullabulling resource.
  • Phoenix grade control returned standout hits including 11m @ 9.0g/t Au and 6m @ 17.1g/t Au, in ground expected to be mined in the first three months of production.
  • Bacchus delivered 1.1m @ 290g/t Au, but with 70% to 85% true width and further drilling needed, it is not a change to average resource grade.
  • Extensional holes hit mineralisation beneath and about 100m below the Phoenix pit shell, pointing to potential resource growth.
  • No DFS timeline is disclosed, though a second grade control program starts shortly to feed the Definitive Feasibility Study.
Summarise with AI:

Grade control drilling confirms Bullabulling resource, with 1.1m @ 290g/t Au at Bacchus

In its 13 October 2026 drilling update, Minerals 260 (ASX:MI6) reported results from 53 infill and extensional holes (11,674m) and 320 grade control holes (25,970m) at its 100%-owned 6.2Moz Bullabulling Gold Project, located 25km south-west of Coolgardie in Western Australia.

The headline intercepts were 1.1m @ 290g/t Au from 170m in BBRD0538 at Bacchus and 7m @ 10.9g/t Au from 7m in BBGC0070 at Phoenix.

For investors, the key point is that grades from the initial grade control program are described as consistent with the Mineral Resource Estimate (MRE). That reduces modelling uncertainty ahead of the Definitive Feasibility Study, although the announcement does not give a DFS timeline.

The company said drilling continues to:

  • Confirm continuity of mineralisation within the 6.2Moz MRE, as well as extensions beyond the MRE boundaries
  • Strengthen confidence in the MRE, with initial grade control results consistent with MRE modelling
  • Intersect thick, high-grade mineralisation in the footwall lodes at Phoenix and Bacchus
  • Support the upgrade of Inferred Resources to Indicated

Phoenix grade control validates the model

Initial program complete

Minerals 260 has completed its initial grade control program, drilled on 10m x 10m spacing. It comprised 320 Reverse Circulation (RC) holes across the Phoenix North and South areas, in an area expected to be mined in the first three months of production.

Preliminary analysis, including 39 RC-RC twin-hole pairs, indicates overall gold grades are consistent with the drilling underpinning the MRE. Put simply, tightly spaced holes are telling the same story as the wider-spaced holes used to build the resource.

A second grade control program will commence shortly. Its results are intended to support the Definitive Feasibility Study, the ongoing grade control strategy and Resource-to-Reserve evaluation.

Standout grade control intercepts

The table below lists selected grade control results from the announcement highlights.

Hole Intercept Including Note
BBGC0026* **21m @ 3.4g/t Au** from 27m 1m @ 52.6g/t Au from 36m Phoenix
BBGC0070* **7m @ 10.9g/t Au** from 7m 2m @ 35.4g/t Au from 7m Phoenix
BBGC0123* **11m @ 9.0g/t Au** from 49m 2m @ 44.8g/t Au from 49m Phoenix
BBGC0267* **6m @ 17.1g/t Au** from 19m 2m @ 45.0g/t Au from 20m Phoenix
BBGC0285* **6m @ 10.0g/t Au** from 22m 2m @ 24.0g/t Au from 23m Phoenix
BBGC0305* **21m @ 2.0g/t Au** from 58m 1m @ 23.9g/t Au from 63m Phoenix

*True widths are estimated at between 85% and 95% of the reported drillhole intercepts.

Luke McFadyen, Managing Director

“Results from our initial grade-control drilling strengthens our confidence in the Mineral Resource and improves our understanding of the mineralisation at a mining scale…”

Infill and extensional results point to growth

Phoenix and Bacchus

At Phoenix (74Mt @ 0.95g/t Au for 2,300koz), infill hole BBRC0733 returned 14m @ 1.0g/t Au from 142m, 5m @ 3.8g/t Au from 206m and 15m @ 1.9g/t Au from 254m.

Extensional drilling supports potential MRE growth. BBRD0009 intersected 8m @ 1.0g/t Au from 354m directly beneath the MRE pit shell, while BBRD0693 returned 5m @ 2.8g/t Au from 412m, about 100m below it.

At Bacchus (72Mt @ 1.0g/t Au for 2,400koz), BBRD0538 returned 1.1m @ 290g/t Au from 170m and 6.5m @ 2.3g/t Au from 270m. BBRD0546 hit 1m @ 35.8g/t Au, and extensional hole BBRD0701 returned 10m @ 2.4g/t Au from 309m.

Keep the 290g/t figure in perspective. It is a 1.1m intercept, with true width estimated at 70% to 85% of the drillhole intercept. The company said additional drilling is planned to assess the geometry and continuity of these higher-grade zones and their potential materiality to the MRE, so it should not be read as a change to average resource grade.

Kraken and Dicksons

Smaller deposits also contributed results:

  • Kraken (16Mt @ 1.1g/t Au for 540koz): BBRC0718 returned 7m @ 1.5g/t Au from 135m
  • Dicksons (22Mt @ 0.9g/t Au for 660koz): BBRC0735 (5m @ 1.8g/t Au), BBRC0736 (7m @ 1.2g/t Au) and BBRC0751 (4m @ 2.3g/t Au)

The deposit figures quoted are Total Resource, not Indicated only. Several extensional holes report diamond tail results only.

What are “jewellery boxes”? Understanding high-grade gold trends

Most of the MRE sits in north-south striking, west-dipping, stacked mineralised lodes. Analysis of drillhole intervals has now improved the definition of higher-grade trends running northeast and northwest, counter to that general orientation.

These interpreted structural controls appear to influence where higher-grade gold sits. Where the trends intersect may provide favourable sites for higher-grade gold concentrations, which the company calls “jewellery boxes”.

A review of visible-gold occurrences found spatial clustering that broadly aligns with these trends, adding geological support for their orientation.

What does that mean for you? Higher-grade zones could, in principle, improve a project’s economics. But their continuity, significance and representation in the existing MRE block model are yet to be determined, so treat this as an exploration idea rather than a confirmed outcome.

Regional targets and next steps

A ground gravity survey defined a continuous north-northwest trending gravity high that hosts the Bullabulling deposit and trends north of the MRE. South of the MRE, the stratigraphy rotates to a southeast trend.

The change in orientation at Kraken is interpreted as a structural inflection, a setting known to be favourable for hosting gold mineralisation in the Eastern Goldfields. The survey has been used to generate further targets for drill testing.

The announcement points to the following next steps:

  1. A second grade control program, commencing shortly
  2. Work to determine the geological controls, continuity and significance of the high-grade trends
  3. Mine planning, grade control design and the Definitive Feasibility Study
  4. Drill testing of regional targets generated by the gravity survey

The current MRE, with an effective reporting date of 8 July 2026, is summarised below.

Category Tonnes Grade Ounces
Indicated **140Mt** **0.98g/t** **4,400koz**
Inferred **51Mt** **1.0g/t** **1,700koz**
Total **190Mt** **1.0g/t** **6,200koz**

Figures are rounded to two significant figures, so numerical differences occur. The announcement does not disclose a production date, financial result or Definitive Feasibility Study timing.

Don’t Miss the Next ASX Gold Breakout

Join 30,000+ investors getting FREE breaking ASX gold news in their inbox within minutes of release, complete with in-depth analysis and the full announcement. Click the “Free Alerts” button at Big News Blast to stay ahead of the market the moment major news breaks.


Frequently Asked Questions

What is grade control drilling?

Grade control drilling is tightly spaced drilling used to define where ore and waste sit ahead of mining. At Bullabulling, Minerals 260 drilled 320 RC holes on 10m x 10m spacing at Phoenix.

What did Minerals 260 report from the Bullabulling Gold Project on 13 October 2026?

It reported results from 53 infill and extensional holes and 320 grade control holes, including 1.1m @ 290g/t Au at Bacchus and 7m @ 10.9g/t Au at Phoenix. Initial grade control grades were consistent with the 6.2Moz Mineral Resource Estimate.

What are jewellery boxes in gold exploration?

Minerals 260 uses the term for sites where northeast and northwest high-grade trends intersect, which may host higher-grade gold concentrations. Their continuity and significance are yet to be determined.

What are the next steps for the Bullabulling Gold Project?

A second grade control program starts shortly, followed by work on high-grade trend controls, mine planning and the Definitive Feasibility Study. Regional targets from the gravity survey will also be drill tested.

How big is the Bullabulling Gold Project resource?

The Mineral Resource Estimate is 190Mt @ 1.0g/t Au for 6,200koz, including 4,400koz Indicated and 1,700koz Inferred. The effective reporting date is 8 July 2026.

William Hadrian
By William Hadrian
Partnerships Director
William supports Discovery Alert subscribers across Australia and overseas, helping them tailor alerts, troubleshoot technical issues, and optimise platform settings to suit their workflow.
Learn More
Companies Mentioned in Article

Breaking ASX Alerts Direct to Your Inbox

Join +30,000 subscribers receiving alerts.
Join thousands of investors who rely on Discovery Alert for timely, accurate mining and commodities market intelligence.

About the Publisher