Aureka Hits Gold on Three New Fronts at Irvine Expanding Beyond 398koz Resource

Aureka's Irvine Project gold discovery just opened on three fronts simultaneously — with first-ever mineralisation confirmed in the 2km gap between lodes, a new deep structure north of the resource, and a high-grade near-surface hit to the south, all sitting outside the current 398koz JORC resource.
By William Hadrian -
  • Aureka has confirmed gold mineralisation across three distinct zones at the Irvine Gold Project, all sitting outside the current 398koz JORC Inferred Mineral Resource and representing genuine extensions to the known system.
  • The Eaglehawk drilling delivered the first significant gold confirmed in the previously undrilled 2km gap between the Resolution and Adventure Lodes, with reef continuity confirmed just 75m vertically from surface.
  • West-flank mineralisation at Eaglehawk mirrors the geometry of the 5.3Moz Magdala Mine at Stawell, where gold was mined on both sides of the same basalt unit — all current Irvine JORC resource sits on the east flank only.
  • The South Resolution hole (RD054) terminated inside 3.09g/t Au mineralisation due to poor ground conditions and will be re-drilled, leaving the primary target untested and high-potential.
  • The pending Wedderburn Gold Processing Mill acquisition, announced 7 September 2026, provides a conceptual processing pathway for all of Aureka's Victorian projects and lifts pro-forma total JORC resources to approximately 455koz @ 2.27g/t Au.
Summarise with AI:

Three new fronts of gold discovered at Aureka’s Irvine Project

Aureka Ltd (ASX: AKA) has intersected significant gold mineralisation across three distinct zones at its flagship Irvine Gold Project in Victoria’s Stawell Corridor, in an announcement dated 15 September 2026. The results include the first significant mineralisation confirmed in the underexplored 2km gap between the Resolution and Adventure Lodes, a newly identified deep structure below the Resolution Lode, and high-grade shallow mineralisation to the south — all sitting outside the current 398koz JORC Inferred Mineral Resource (comprising Resolution Lode: 358koz; Adventure Lode: 40koz). Drilling remains ongoing, and results from hole RD058 are partial, with further assays pending QAQC completion.

Aureka's Three New Discovery Fronts

What the three drill zones revealed

North Resolution — new structure at depth

Hole RD058 intersected what appears to be a newly identified northern mineralised structure located approximately 80m west of the Resolution Fault — placing it outside the current Inferred Mineral Resource area. Because assay results from RD058 are partial and subject to ongoing QAQC validation, any further significant results will be reported separately once finalised.

Significant assays returned from RD058 to date include:

  • 3.92m @ 4.74g/t Au from 238.82m, including 0.72m @ 9.18g/t Au from 238.82m and 0.5m @ 16.1g/t Au from 241.64m
  • 0.95m @ 3.71g/t Au from 116.75m

Mineralisation occurs along the faulted margins between basalt and sediments, reinforcing the rheological contact model analogous to the +5.3Moz Magdala Mine at Stawell, approximately 16km to the north. The newly identified structure has the potential to deliver further down-plunge high-grade gold intercepts at depth, with additional drilling planned in due course.

High-grade intercepts at Resolution have been a recurring feature of Aureka’s drilling program, establishing the structural precedent that the current holes targeting depth extensions and southern up-dip zones are building upon.

South Resolution — high-grade intercept near surface

Hole RD054 targeted the Advanced Exploration Target immediately up-dip and to the south of the Resolution Lode. A Tenacity-styled HW structure (the same structure type that has historically delivered some of the highest grades at Irvine) was intersected at 155.1m, with individual assay values of up to 9.44g/t Au.

Significant assays from RD054 include:

  • 3.5m @ 2.79g/t Au from 155.1m, including 0.7m @ 8.78g/t Au from 155.1m
  • 1.7m @ 2.1g/t Au from 160m — note the hole terminated in 3.09g/t Au mineralisation due to poor ground conditions

Poor ground conditions caused by increased structural complexity and the likely convergence of nearby fault margins prevented full penetration of the targeted zone. The hole ended within the mineralised structures, representing an inconclusive test of the projected target. It will be re-drilled from another angle, with high potential remaining.

Eaglehawk area — first mineralisation in the 2km gap

Diamond drilling in the Eaglehawk area has delivered the first significant mineralisation confirmed within the underexplored 2km gap separating the Resolution and Adventure Lodes. Drilling was conducted along strike of the historic Eaglehawk mine, located approximately 800m west of the main Resolution-Adventure Shear on the western side of the Irvine basalt, confirming reef continuity only 75m vertically from surface.

Significant assays from the Eaglehawk holes include:

  • EH002: 0.9m @ 3.84g/t Au from 145.9m and 0.2m @ 6.01g/t Au from 288.75m
  • EH004: 2.25m @ 1.34g/t Au from 90.7m (individual assays up to 3.04g/t Au)
  • EH001: 1.0m @ 3.98g/t Au from 258m and 0.6m @ 1.68g/t Au from 308.95m

Critically, all current JORC mineralisation at Irvine sits on the east flank of the Magdala Basalt. These results on the west flank demonstrate the expansion potential of the system, possibly analogous to the 5.3Moz Magdala Mine at Stawell where mineralisation and mining has occurred on both sides of the same basalt unit.

Understanding the Irvine system — why this discovery matters

A JORC Mineral Resource is a formally estimated quantity of mineralisation classified by confidence level (Inferred, Indicated, or Measured) that meets a reasonable prospect for eventual economic extraction. Drilling results outside that boundary do not yet contribute to the resource figure — but they expand the geological system and are the direct precursor to future resource growth.

The 2km gap between Resolution and Adventure has been an underdrilled corridor separating two known lodes. Confirming gold-bearing structures within it for the first time materially expands the known footprint of the Irvine system. The Magdala analogy is instructive: at the 5.3Moz Stawell Goldfield, mineralisation occurs on both sides of the same basalt unit that separates zones at Irvine. Aureka is now seeing early evidence this bilateral pattern could also apply at its project.

The company has defined Exploration Targets for the Irvine project that contextualise how much additional resource could potentially exist beyond the current JORC estimate:

Exploration Target Tonnes (Mt) Gold Grade (g/t) Gold Ounces (koz)
Advanced Targets 1.33 – 2.66 2.0 – 2.3 85 – 197
Conceptual Targets 2.35 – 4.7 2.0 – 2.3 151 – 348

The potential quantity and grade of the Exploration Target is conceptual in nature and there has been insufficient exploration to estimate a Mineral Resource. It is uncertain if further exploration will result in the estimation of a Mineral Resource.

Aureka’s broader Victorian gold portfolio

Aureka is an integrated Victorian gold company encompassing current production, near-term development, and large-scale growth projects. On a pro-forma basis (conditional on successful close of the mine and mill acquisition announced on 7 September 2026), Aureka’s total JORC Inferred Mineral Resources amount to approximately 455koz @ 2.27g/t Au across all projects. The portfolio includes:

  • Irvine Gold Project (flagship): 398koz JORC Inferred, located 16km from the operating Stawell Gold Mine with a production history of over 5Moz
  • Fiddlers Creek Underground Gold & Silver Mine: restarted production in 2025 as a high-grade, smaller-scale operation
  • Comstock (St Arnaud): 56koz JORC Inferred @ 1.21g/t gold; production licence in application
  • Wedderburn Gold Processing Mill: one of a limited number of gold mills in Victoria; currently processing Fiddlers Creek ore; pending acquisition close (announced 7 September 2026), providing a conceptual pathway to first production for all projects
  • Jubilee and Morning Bill: gold and base metals exploration projects

Visible gold at the St Arnaud project (the Comstock asset listed at 56koz JORC Inferred) provided an earlier signal of the broader mineralised system across Aureka’s Victorian portfolio, with a production licence now in application.

The Wedderburn mill acquisition is the connective tissue across the portfolio. It provides Irvine and Aureka’s other projects with a conceptual processing route that did not previously exist as a company-owned asset.

What management said

James Gurry, Managing Director

“Our flagship Irvine Gold Project continues to yield new mineralisation in multiple areas – at depth in the north, closer to surface in the south, and west in the 2km gap between the lodes. The acquisition of Wedderburn Gold Processing facility, one of only a small number of mills in Victoria, now provides all our projects with a conceptual pathway to first production…”

Jozef Story, Exploration Manager

“The most recent intercepts successfully demonstrate extensions beyond current JORC Mineral Resource Estimate and the historically mined Eaglehawk workings and reiterate the importance of exploring for additional gold mineralisation associated with emerging second order structures distal to the main Irvine Shear…”

Drilling remains ongoing at Irvine as the company targets mineral extensions within its Advanced Exploration Targets. Aureka’s stated aim is to grow the Irvine project to beyond 1Moz of gold resources. Despite 59km of drilling completed since discovery in 2017, management describes the technical geological framework and definitive mineralising controls at Irvine as still being in their infancy.

Global Mineral Resource summary

The table below presents Aureka’s full global JORC Mineral Resource, sourced from Table 2 in the 15 September 2026 announcement.

Prospect Cut-Off (g/t) Tonnes Gold Grade (g/t) Gold Ounces
Resolution Open Pit >0.5 1,775,000 2.16 123,000
Adventure Open Pit >0.6 680,000 1.85 40,300
Total Irvine (Stawell) Open Pit Various 2,455,000 2.07 163,300
Resolution Underground >1.0 2,335,000 3.13 235,000
Total Irvine (Stawell) Various 4,790,000 2.59 398,300
Comstock (St Arnaud) >0.5 1,450,000 1.21 56,500
Total All Projects Various 6,240,000 2.27 454,800

There is a low level of geological confidence associated with inferred mineral resources and there is no certainty that further exploration work will result in the determination of indicated mineral resources or that the production target itself will be realised.

Don’t Miss the Next ASX Gold Discovery

Get FREE breaking ASX gold news delivered to your inbox within minutes of release, complete with in-depth analysis. Join 30,000+ subscribers already staying ahead of the market with Big News Blast. Click the “Free Alerts” button to start receiving alerts the moment market-moving gold news breaks.


Frequently Asked Questions

What is the Aureka Irvine Project gold discovery and why does it matter?

The Irvine Gold Project is Aureka's flagship asset in Victoria's Stawell Corridor, currently holding a 398koz JORC Inferred Mineral Resource. The September 2026 discovery announcement confirmed significant gold mineralisation across three new zones outside the existing resource boundary, including the first-ever gold confirmed in the 2km gap between the Resolution and Adventure Lodes.

What gold grades did Aureka intersect in the latest Irvine drilling results?

Key intercepts include 3.92m @ 4.74g/t Au (including 0.5m @ 16.1g/t Au) from the North Resolution zone, 3.5m @ 2.79g/t Au (including 0.7m @ 8.78g/t Au) from South Resolution, and multiple hits in the Eaglehawk area on the west flank of the Irvine basalt, with values up to 6.01g/t Au.

What is the significance of the 2km gap between the Resolution and Adventure Lodes at Irvine?

The 2km gap was a largely undrilled corridor separating two known gold lodes. Aureka's Eaglehawk drilling has now confirmed gold-bearing structures within that gap for the first time, materially expanding the known footprint of the Irvine system and opening a new exploration front that sits entirely outside the current JORC resource.

How does the Magdala Mine comparison apply to Aureka's Irvine Project?

The 5.3Moz Magdala Mine at Stawell produced gold from both sides of the same type of basalt unit that separates zones at Irvine. All of Aureka's current JORC resource sits on the east flank of the Irvine basalt, so the Eaglehawk results on the west flank suggest the deposit could follow the same bilateral pattern — though this remains an early-stage geological analogy, not a confirmed resource.

What is Aureka's total gold resource across all projects?

On a pro-forma basis — conditional on the successful close of the Wedderburn Gold Processing Mill acquisition announced 7 September 2026 — Aureka's total JORC Inferred Mineral Resources amount to approximately 455koz @ 2.27g/t Au across all projects, including the 398koz Irvine resource and 56.5koz at Comstock (St Arnaud).

William Hadrian
By William Hadrian
Partnerships Director
William supports Discovery Alert subscribers across Australia and overseas, helping them tailor alerts, troubleshoot technical issues, and optimise platform settings to suit their workflow.
Learn More
Companies Mentioned in Article

Breaking ASX Alerts Direct to Your Inbox

Join +30,000 subscribers receiving alerts.
Join thousands of investors who rely on Discovery Alert for timely, accurate mining and commodities market intelligence.